Construction Update - 9/9/2019

The trail was closed to the public on 9/3/19 to allow for construction crews to begin site preparations for the upcoming construction. Crews installed erosion and sediment control measures and perimeter fencing around the upper (west) area of the trail. This area will be excavated to allow for the installation of new storm drain, concrete manholes, and concrete headwall. During this work activity, this area of the trail will not be accessible.

IMG_1303.jpg
IMG_1302.jpg